Text Size
 Water Treatment Installation (Soft Drinks)

Beverage Facility Florida (Equipment, Process & Utility Piping Installation)

  • Dual Train Ultra Filtration Unit
  • Dual Train Reverse Osmosis Filtration Unit
  • CIP Tank / Skid
  • Pump Skid
  • Blow Molder
  • Injection Molding Machine
  • Cooling Tower
  • High and Low Air Compressors
  • Chiller 
  • Polishing Filters
  • New Distribution Treated Water Header
  • Temporary Water Treatment System
  • (3) 20,000 gallon fiberglass UF and CSD Water tanks
  • Installation of all Utility Piping – PVC, Schedule 10 SS, and Carbon Steel Pipe
  • Installation of all Interconnecting Piping – 316 SS Sanitary Tubing
 
  Bottling Equipment Installation (Bottle Water and Teas) Beverage Facility Louisiana (Equipment, Process & Utility Piping Installation)
  • Process Equipment (Tetra Pak & Sidel)
  • Pump Skids
  • Valve Matrix / Flow Panels
  • (4) 5,000 gallon stainless steel mixing tanks
  • Blow Molding Equipment
  • Platforms
  • Packaging equipment
  • Installation of all Interconnecting Piping – 316 SS Sanitary Tubing
  • Installation of all Utility Piping
 DSC01024
  Bakery Equipment Design and Install (Mixing System)

Bakery Facility Georgia (Designed and Equipment, Process & Utility Piping Installation)

  • System Design and Layout
  • Controls, MCC Panels & Panel Views
  • (2) Hot Water Sets
  • Ribbon & Upright Mixers
  • Waukesha PD pumps
  • Krohne Meters (Mass Flow)
  • Kettles
  • Install all Utility Piping (Steam, Water & Air)
  • Installed all Interconnecting Piping – 304 SS Sanitary Tubing
  • Provided startup / SOPs / troubleshooting
 
  Fresh Salads Manufacturing (Equipment Installation)

Salad Manufacturing Facility Ohio (Equipment, Process & Utility Piping Installation)

  • Utility piping (Air, Steam, Hydraulics, Water & Nitrogen)
  • Pumps and Valving
  • Process Piping (Chlorinated Water Distribution header)
  • Packaging Equipment – Scales (4), optical sorters, conveying systems for ingredients and finished product
  • Modification of Existing Equipment
  • Added capacity to High Pressure Water System (40,000 psi)
  • Bakery Equipment Design and Install (Bulk Oil System)
  • Bakery Facility Ohio (Designed and Equipment, Process & Utility Piping Installation)
  • System Design and Layout
  • Controls, Panels MCC & Panel Views
  • (2) Bulk Oil Storage Tanks
  • PD pumps
  • Krohne Meters (Mass Flow)
  • Install all Utility Piping (Steam, Water & Air)
  • Installed all Interconnecting Piping – 304 SS Sanitary Tubing
  • Start Up, Training and SOP
 
 

Bakery Equipment Design and Install (Sweetener System)

Bakery Facility Ohio (Designed and Equipment, Process & Utility Piping Installation)

  • System Design and Layout
  • Controls, Panels MCC & Panel Views
  • (3) Bulk Oil Storage Tanks
  • Product Temperature Control Skid
  • PD pumps
  • Krohne Meters (Mass Flow)
  • Install all Utility Piping (Steam, Water & Air)
  • Installed all Interconnecting Piping – 304 SS Sanitary Tubing
  • Start Up, Training and SOP